Skip to content

fix: Adjust connection center design #5738

fix: Adjust connection center design

fix: Adjust connection center design #5738

Triggered via pull request November 6, 2023 13:30
Status Cancelled
Total duration 11m 57s
Artifacts

e2e.yml

on: pull_request
Matrix: Cypress Smoke tests
Fit to window
Zoom out
Zoom in

Annotations

4 errors
Cypress Smoke tests (3)
Canceling since a higher priority waiting request for 'e2e-refs/pull/2745/merge' exists
Cypress Smoke tests (3)
The operation was canceled.
Cypress Smoke tests (1)
The operation was canceled.
Cypress Smoke tests (2)
The operation was canceled.