Upper bounds for time-domain and monad-schedule #446
Triggered via pull request
November 21, 2023 09:44
Status
Failure
Total duration
17m 50s
Artifacts
–
ci.yml
on: pull_request
Generate matrix from cabal
2s
Run hlint
6s
Run fourmolu
5s
Matrix: Nix Flake
Matrix: build-cabal
Matrix: build-stack
Annotations
7 errors and 1 warning
Haskell GHC 8.10.7 stack
Process completed with exit code 1.
|
Haskell GHC 9.2.5 stack
The job was canceled because "_8_10_7_ubuntu-latest" failed.
|
Haskell GHC 9.2.5 stack
Process completed with exit code 1.
|
Haskell GHC 9.4.4 stack
The job was canceled because "_8_10_7_ubuntu-latest" failed.
|
Haskell GHC 9.4.4 stack
The operation was canceled.
|
Haskell GHC 9.0.2 stack
The job was canceled because "_8_10_7_ubuntu-latest" failed.
|
Haskell GHC 9.0.2 stack
The operation was canceled.
|
Haskell GHC 8.10.7 cabal
Cache save failed.
|