Skip to content

fix ci config

fix ci config #87

Triggered via push October 10, 2024 01:35
Status Failure
Total duration 22m 11s
Artifacts 2
Matrix: integration-test
Matrix: rust-test-core
Matrix: rust-test-schedulers
Fit to window
Zoom out
Zoom in

Annotations

16 errors
rust-test-schedulers (scx_rusty)
Process completed with exit code 101.
rust-test-schedulers (scx_layered)
The job was canceled because "scx_rusty" failed.
rust-test-schedulers (scx_layered)
The operation was canceled.
rust-test-core (scx_rustland_core)
Process completed with exit code 101.
rust-test-core (scx_utils)
The job was canceled because "scx_rustland_core" failed.
rust-test-core (scx_utils)
The operation was canceled.
rust-test-core (scx_loader)
The job was canceled because "scx_rustland_core" failed.
rust-test-core (scx_loader)
The operation was canceled.
rust-test-core (scx_stats)
The job was canceled because "scx_rustland_core" failed.
rust-test-core (scx_stats)
The operation was canceled.
integration-test (scx_layered)
Process completed with exit code 1.
integration-test (scx_layered)
Process completed with exit code 1.
integration-test (scx_layered)
Process completed with exit code 1.
integration-test (scx_rusty)
Process completed with exit code 1.
integration-test (scx_rusty)
Process completed with exit code 1.
integration-test (scx_rusty)
Process completed with exit code 1.

Artifacts

Produced during runtime
Name Size
scx_layered_logs_11265854989_1
15.4 KB
scx_rusty_logs_11265854989_1
15.3 KB