Skip to content

fix ci config

fix ci config #80

Triggered via push October 4, 2024 12:04
Status Failure
Total duration 3m 54s
Artifacts 2
Matrix: integration-test
Matrix: rust-test-core
Matrix: rust-test-schedulers
Fit to window
Zoom out
Zoom in

Annotations

16 errors
integration-test (scx_layered)
Process completed with exit code 1.
integration-test (scx_layered)
Process completed with exit code 1.
integration-test (scx_layered)
Process completed with exit code 1.
integration-test (scx_rusty)
Process completed with exit code 1.
integration-test (scx_rusty)
Process completed with exit code 1.
integration-test (scx_rusty)
Process completed with exit code 1.
rust-test-core (scx_utils)
Process completed with exit code 101.
rust-test-core (scx_rustland_core)
The job was canceled because "scx_utils" failed.
rust-test-core (scx_rustland_core)
The operation was canceled.
rust-test-core (scx_stats)
The job was canceled because "scx_utils" failed.
rust-test-core (scx_stats)
The operation was canceled.
rust-test-core (scx_loader)
The job was canceled because "scx_utils" failed.
rust-test-core (scx_loader)
The operation was canceled.
rust-test-schedulers (scx_rusty)
Process completed with exit code 101.
rust-test-schedulers (scx_layered)
The job was canceled because "scx_rusty" failed.
rust-test-schedulers (scx_layered)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
scx_layered_logs_11179580185_1
15.4 KB
scx_rusty_logs_11179580185_1
15.4 KB