Skip to content

Merge pull request #25 from mrdarrengriffin/ohf-logo #25

Merge pull request #25 from mrdarrengriffin/ohf-logo

Merge pull request #25 from mrdarrengriffin/ohf-logo #25

Triggered via push October 16, 2024 16:23
Status Failure
Total duration 43s
Artifacts

test.yml

on: push
Matrix: test on linux
Fit to window
Zoom out
Zoom in

Annotations

7 errors
test on linux (3.9)
Process completed with exit code 1.
test on linux (3.8)
The job was canceled because "_3_9" failed.
test on linux (3.8)
Process completed with exit code 1.
test on linux (3.11)
The job was canceled because "_3_9" failed.
test on linux (3.11)
The operation was canceled.
test on linux (3.10)
The job was canceled because "_3_9" failed.
test on linux (3.10)
The operation was canceled.