Skip to content

chore: update package lock #62

chore: update package lock

chore: update package lock #62

Triggered via push September 2, 2024 15:22
Status Failure
Total duration 43s
Artifacts
Matrix: Verify
Publish
0s
Publish
Fit to window
Zoom out
Zoom in

Annotations

5 errors
Verify (E2E tests, test:e2e)
Process completed with exit code 1.
Verify (Unit tests, test:unit)
The job was canceled because "E2E_tests_test_e2e" failed.
Verify (Unit tests, test:unit)
Process completed with exit code 1.
Verify (Lint, test:lint)
The job was canceled because "E2E_tests_test_e2e" failed.
Verify (Lint, test:lint)
The operation was canceled.