Adding Case studies #94
Merged
DCO-2 / DCO
succeeded
Sep 27, 2024 in 1s
Check passed!
All commits are signed off, the check passed.
Summary
Sha | Message | Pass or fail reason | |
---|---|---|---|
🟢 | 21c0375 | add test case study | Valid sign-off found |
🟢 | 7aedaaf | adding newsletter functionality | Valid sign-off found |
🟢 | 4d28230 | Merge branch 'main' into case-studies | Skipped: sign-off not required in merge commit |
🟢 | 2e1c831 | improve case study schema | Valid sign-off found |
🟢 | 3d0e823 | tmp | Valid sign-off found |
🟢 | a4f73cb | tmp | Valid sign-off found |
🟢 | de36d2b | Merge branch 'main' into case-studies | Skipped: sign-off not required in merge commit |
🟢 | 61697eb | chore: fix validation script | Valid sign-off found |
Loading