Skip to content
New issue

Have a question about this project? Sign up for a free GitHub account to open an issue and contact its maintainers and the community.

By clicking “Sign up for GitHub”, you agree to our terms of service and privacy statement. We’ll occasionally send you account related emails.

Already on GitHub? Sign in to your account

Test only - port Zigbee to nRF54L #17089

Closed

Conversation

AdamZelikNS
Copy link
Contributor

No description provided.

This change is for initial tests of getting Zigbee working on nrf54l15pdk

Signed-off-by: Adam Zelik <[email protected]>
Adaptation to the new platform.

Signed-off-by: Adam Zelik <[email protected]>
@github-actions github-actions bot added manifest changelog-entry-required Update changelog before merge. Remove label if entry is not needed or already added. labels Aug 29, 2024
@NordicBuilder
Copy link
Contributor

The following west manifest projects have been modified in this Pull Request:

Name Old Revision New Revision Diff
zephyr AdamZelikNS/sdk-zephyr@28b6861 AdamZelikNS/sdk-zephyr@1f211bb (tst/port_zb_to_54L_1st_attempt) AdamZelikNS/[email protected]

Note: This message is automatically posted and updated by the Manifest GitHub Action.

@NordicBuilder
Copy link
Contributor

CI Information

To view the history of this post, clich the 'edited' button above
Build number: 1

Inputs:

Sources:

more details

Github labels

Enabled Name Description
ci-disabled Disable the ci execution
ci-all-test Run all of ci, no test spec filtering will be done
ci-force-downstream Force execution of downstream even if twister fails
ci-run-twister Force run twister
ci-run-zephyr-twister Force run zephyr twister
List of changed files detected by CI (0)

Outputs:

Toolchain

Version:
Build docker image:

Test Spec & Results: ✅ Success; ❌ Failure; 🟠 Queued; 🟡 Progress; ◻️ Skipped

  • ◻️ Toolchain
  • ◻️ Build twister
  • ◻️ Integration tests
Disable integration tests

Note: This message is automatically posted and updated by the CI

@NordicBuilder
Copy link
Contributor

You can find the documentation preview for this PR at this link. It will be updated about 10 minutes after the documentation build succeeds.

Note: This comment is automatically posted by the Documentation Publishing GitHub Action.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment
Labels
changelog-entry-required Update changelog before merge. Remove label if entry is not needed or already added. manifest manifest-zephyr
Projects
None yet
Development

Successfully merging this pull request may close these issues.

2 participants