Skip to content

fix(zk chains): Increase Batch Seal Default Deadline (#3154) #1869

fix(zk chains): Increase Batch Seal Default Deadline (#3154)

fix(zk chains): Increase Batch Seal Default Deadline (#3154) #1869

Triggered via push October 23, 2024 11:33
Status Failure
Total duration 41m 10s
Artifacts
Test changed-files
7s
Test changed-files
Matrix: Build and push images / Build and Push Docker Images
Matrix: Build and push images / Build and Push Docker Images
Matrix: Build and push images / Build and Push Docker Images
Build and push images  /  Build and Push Docker Images
2m 12s
Build and push images / Build and Push Docker Images
Matrix: Build and push prover images with avx512 instructions / Build and Push Docker Images
Matrix: Build and push images / Create release manifest
Matrix: Build and push images / Create release manifest
Matrix: Build and push images / Copy images between docker registries
Build GAR prover FRI GPU  /  Build prover FRI GPU GAR
17m 25s
Build GAR prover FRI GPU / Build prover FRI GPU GAR
Fit to window
Zoom out
Zoom in

Annotations

1 error
Build GAR prover FRI GPU / Build prover FRI GPU GAR
The self-hosted runner: matterlabs-ci-runner-high-performance-6c8ht-runner-4llkk lost communication with the server. Verify the machine is running and has a healthy network connection. Anything in your workflow that terminates the runner process, starves it for CPU/Memory, or blocks its network access can cause this error.