chore(deps-dev): bump black from 24.8.0 to 24.10.0 #7133
testing.yml
on: push
Documentation
3m 15s
Long tests on Python 3.10
42m 8s
Tests that may fail due to network or HTML
49m 56s
Windows long tests
9m 32s
Matrix: Linux tests
Annotations
10 errors and 1 warning
Linux tests (3.8)
Process completed with exit code 1.
|
Linux tests (3.12)
The job was canceled because "_3_8" failed.
|
Linux tests (3.12)
The operation was canceled.
|
Linux tests (3.11)
The job was canceled because "_3_8" failed.
|
Linux tests (3.11)
The operation was canceled.
|
Linux tests (3.9)
The job was canceled because "_3_8" failed.
|
Linux tests (3.9)
The operation was canceled.
|
Windows long tests
Process completed with exit code 1.
|
Long tests on Python 3.10
The self-hosted runner: ephemeral-action-runner-ubuntu-2404-i-0138b0dba459f7799 lost communication with the server. Verify the machine is running and has a healthy network connection. Anything in your workflow that terminates the runner process, starves it for CPU/Memory, or blocks its network access can cause this error.
|
Tests that may fail due to network or HTML
The job running on runner ephemeral-action-runner-ubuntu-2404-i-080102c1453acdd2a has exceeded the maximum execution time of 45 minutes.
|
Tests that may fail due to network or HTML
Runner ephemeral-action-runner-ubuntu-2404-i-080102c1453acdd2a did not respond to a cancelation request with 00:05:00.
|