chore(deps-dev): bump pre-commit from 3.8.0 to 4.0.1 #7125
testing.yml
on: push
Documentation
3m 30s
Long tests on Python 3.10
54m 48s
Tests that may fail due to network or HTML
49m 42s
Windows long tests
7m 27s
Matrix: Linux tests
Annotations
8 errors and 1 warning
Windows long tests
Process completed with exit code 1.
|
Linux tests (3.9)
The self-hosted runner: ephemeral-action-runner-ubuntu-2404-i-00b6ff92eb8d53422 lost communication with the server. Verify the machine is running and has a healthy network connection. Anything in your workflow that terminates the runner process, starves it for CPU/Memory, or blocks its network access can cause this error.
|
Linux tests (3.12)
The job was canceled because "_3_9" failed.
|
Linux tests (3.12)
The operation was canceled.
|
Linux tests (3.8)
The job was canceled because "_3_9" failed.
|
Linux tests (3.8)
The operation was canceled.
|
Tests that may fail due to network or HTML
The job running on runner ephemeral-action-runner-ubuntu-2404-i-083447fe9bc4d7f73 has exceeded the maximum execution time of 45 minutes.
|
Long tests on Python 3.10
Process completed with exit code 137.
|
Long tests on Python 3.10
The following actions use a deprecated Node.js version and will be forced to run on node20: technote-space/get-diff-action@f27caffdd0fb9b13f4fc191c016bb4e0632844af. For more info: https://github.blog/changelog/2024-03-07-github-actions-all-actions-will-run-on-node20-instead-of-node16-by-default/
|