Remove network from CardanoDbBeacon
#7596
ci.yml
on: pull_request
Matrix: test
check
1m 58s
Matrix: build
build-test-wasm
1m 39s
build-ubuntu-X64
4m 30s
cargo-doc
40s
build-docusaurus
1m 48s
build-open-api-ui
12s
publish-docs
0s
Matrix: docker-mithril
unstable-release
0s
Matrix: publish-crate-test
Matrix: deploy-testing
Annotations
4 errors
build-ubuntu-X64
Canceling since a higher priority waiting request for 'ci-build-test-refs/pull/2110/merge' exists
|
build-ubuntu-X64
The operation was canceled.
|
test (ubuntu-22.04)
Canceling since a higher priority waiting request for 'ci-build-test-refs/pull/2110/merge' exists
|
test (ubuntu-22.04)
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
docusaurus-build
|
6.91 MB |
|
explorer-build
|
1.32 MB |
|
mithril-deb-packages-Linux-X64
|
22.7 MB |
|
mithril-distribution-Linux-X64
|
61.5 MB |
|
mithril-distribution-Windows-X64
|
4.78 MB |
|
mithril-distribution-macOS-ARM64
|
25.5 MB |
|
mithril-distribution-macOS-X64
|
26.1 MB |
|
mithril-distribution-wasm
|
588 KB |
|
mithril-rust-doc
|
8.02 MB |
|
openapi-ui-build
|
466 KB |
|
test-results-Windows-X64
|
2.01 KB |
|
test-results-macOS-ARM64
|
2.05 KB |
|
test-results-macOS-X64
|
2.13 KB |
|