Otter is now available as a cache option #20
on-pull-request.yml
on: pull_request
go-bench
7m 46s
Matrix: test
Annotations
5 errors
test (1.22.x, ubuntu-latest)
Process completed with exit code 1.
|
test (1.21.x, ubuntu-latest)
The job was canceled because "_1_22_x_ubuntu-latest" failed.
|
test (1.21.x, ubuntu-latest)
The operation was canceled.
|
go-bench
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
|
go-bench
Process completed with exit code 143.
|