Skip to content

DO NOT MERGE: Test PR #20

DO NOT MERGE: Test PR

DO NOT MERGE: Test PR #20

Triggered via issue September 20, 2024 14:02
Status Failure
Total duration 1m 21s
Artifacts

pr-integration-tests.yml

on: issue_comment
Matrix: grafana-integration-tests
Fit to window
Zoom out
Zoom in

Annotations

6 errors
grafana-integration-tests (v10.3.x, oss)
Process completed with exit code 1.
grafana-integration-tests (v10.4.x, oss)
The job was canceled because "v10_3_x_oss" failed.
grafana-integration-tests (main, oss)
The job was canceled because "v10_3_x_oss" failed.
grafana-integration-tests (v11.2.x, oss)
The job was canceled because "v10_3_x_oss" failed.
grafana-integration-tests (v11.0.x, oss)
The job was canceled because "v10_3_x_oss" failed.
grafana-integration-tests (v11.1.x, oss)
The job was canceled because "v10_3_x_oss" failed.