Skip to content

Chore: Add Grafana version test coverage #14

Chore: Add Grafana version test coverage

Chore: Add Grafana version test coverage #14

Triggered via pull request September 18, 2024 01:20
Status Failure
Total duration 1m 3s
Artifacts

pr-integration-tests.yml

on: pull_request
Matrix: grafana-integration-test
Fit to window
Zoom out
Zoom in

Annotations

36 errors
grafana-integration-test (v10.4.x, enterprise)
The process '/usr/bin/git' failed with exit code 128
grafana-integration-test (main, enterprise)
The job was canceled because "v10_4_x_enterprise" failed.
grafana-integration-test (main, enterprise)
The process '/usr/bin/git' failed with exit code 128
grafana-integration-test (v11.1.x, enterprise)
The job was canceled because "v10_4_x_enterprise" failed.
grafana-integration-test (v11.1.x, enterprise)
The operation was canceled.
grafana-integration-test (v11.0.x, enterprise)
The job was canceled because "v10_4_x_enterprise" failed.
grafana-integration-test (v11.0.x, enterprise)
The operation was canceled.
grafana-integration-test (v11.2.x, enterprise)
The job was canceled because "v10_4_x_enterprise" failed.
grafana-integration-test (v11.2.x, enterprise)
The operation was canceled.
grafana-integration-test (v10.3.x, enterprise)
The job was canceled because "v10_4_x_enterprise" failed.
grafana-integration-test (v10.3.x, enterprise)
The operation was canceled.
grafana-integration-test (v10.4.x, oss)
The job was canceled because "v10_4_x_enterprise" failed.
grafana-integration-test (v10.4.x, oss)
The operation was canceled.
grafana-integration-test (v11.0.x, oss)
The job was canceled because "v10_4_x_enterprise" failed.
grafana-integration-test (v11.0.x, oss)
The operation was canceled.
grafana-integration-test (v10.3.x, oss)
The job was canceled because "v10_4_x_enterprise" failed.
grafana-integration-test (v10.3.x, oss)
The operation was canceled.
grafana-integration-test (v11.2.x, oss)
The job was canceled because "v10_4_x_enterprise" failed.
grafana-integration-test (v11.2.x, oss)
The operation was canceled.
grafana-integration-test (v11.1.x, oss)
The job was canceled because "v10_4_x_enterprise" failed.
grafana-integration-test (v11.1.x, oss)
The operation was canceled.
grafana-integration-test (main, oss)
The job was canceled because "v10_4_x_enterprise" failed.