Skip to content

Chore: Add Grafana version test coverage #12

Chore: Add Grafana version test coverage

Chore: Add Grafana version test coverage #12

Re-run triggered September 18, 2024 19:33
Status Failure
Total duration 14m 37s
Artifacts

pr-integration-tests.yml

on: pull_request
Matrix: grafana-integration-test
Fit to window
Zoom out
Zoom in

Annotations

5 errors
grafana-integration-test (v10.4.x)
Process completed with exit code 1.
grafana-integration-test (v11.1.x)
The job was canceled because "v10_4_x" failed.
grafana-integration-test (v11.2.x)
The job was canceled because "v10_4_x" failed.
grafana-integration-test (v11.0.x)
The job was canceled because "v10_4_x" failed.
grafana-integration-test (main)
The job was canceled because "v10_4_x" failed.