Skip to content

Slog Handler Elastic APM Integration #669

Slog Handler Elastic APM Integration

Slog Handler Elastic APM Integration #669

Re-run triggered April 22, 2024 06:56
Status Cancelled
Total duration 3m 15s
Artifacts 1

ci.yml

on: pull_request
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

12 errors
precheck
Process completed with exit code 2.
test (stable)
Process completed with exit code 2.
test (oldstable)
The job was canceled because "stable" failed.
test (oldstable)
Process completed with exit code 2.
run-benchdiff
error posting result: 403 - Resource not accessible by integration
run-benchdiff
see result below
run-benchdiff
Process completed with exit code 1.
test-macos
Canceling since a higher priority waiting request for 'ci-refs/pull/1597/merge' exists
test-macos
The operation was canceled.
coverage
Canceling since a higher priority waiting request for 'ci-refs/pull/1597/merge' exists
coverage
The operation was canceled.
ci
Process completed with exit code 1.

Artifacts

Produced during runtime
Name Size
benchdiff-report Expired
1.69 KB