Skip to content
New issue

Have a question about this project? Sign up for a free GitHub account to open an issue and contact its maintainers and the community.

By clicking “Sign up for GitHub”, you agree to our terms of service and privacy statement. We’ll occasionally send you account related emails.

Already on GitHub? Sign in to your account

DAOS-16170 cart: do not release completed RPC reference repeatedly - b26 #15477

Draft
wants to merge 1 commit into
base: release/2.6
Choose a base branch
from

Conversation

Nasf-Fan
Copy link
Contributor

@Nasf-Fan Nasf-Fan commented Nov 8, 2024

For collective RPC, when handle failure cases during crt_req_send(),
its reference may has been released via crt_rpc_complete_and_unlock()
that is triggered by crt_corpc_complete(). Under such case, we should
check whether the RPC is completed or not before calling RPC_DECREF()
to avoid releasing the RPC reference repeatedly.

The patch also initializes some local variable for CHK RPC to avoid
accessing invalid DRAM when handle failed collective CHK RPC.

Some enhancement for CR test logic.

Test-tag: test_daos_cat_recov_core
Allow-unstable-test: true

Signed-off-by: Fan Yong [email protected]

Before requesting gatekeeper:

  • Two review approvals and any prior change requests have been resolved.
  • Testing is complete and all tests passed or there is a reason documented in the PR why it should be force landed and forced-landing tag is set.
  • Features: (or Test-tag*) commit pragma was used or there is a reason documented that there are no appropriate tags for this PR.
  • Commit messages follows the guidelines outlined here.
  • Any tests skipped by the ticket being addressed have been run and passed in the PR.

Gatekeeper:

  • You are the appropriate gatekeeper to be landing the patch.
  • The PR has 2 reviews by people familiar with the code, including appropriate owners.
  • Githooks were used. If not, request that user install them and check copyright dates.
  • Checkpatch issues are resolved. Pay particular attention to ones that will show up on future PRs.
  • All builds have passed. Check non-required builds for any new compiler warnings.
  • Sufficient testing is done. Check feature pragmas and test tags and that tests skipped for the ticket are run and now pass with the changes.
  • If applicable, the PR has addressed any potential version compatibility issues.
  • Check the target branch. If it is master branch, should the PR go to a feature branch? If it is a release branch, does it have merge approval in the JIRA ticket.
  • Extra checks if forced landing is requested
    • Review comments are sufficiently resolved, particularly by prior reviewers that requested changes.
    • No new NLT or valgrind warnings. Check the classic view.
    • Quick-build or Quick-functional is not used.
  • Fix the commit message upon landing. Check the standard here. Edit it to create a single commit. If necessary, ask submitter for a new summary.

Copy link

github-actions bot commented Nov 8, 2024

Ticket title is 'recovery/cat_recov_core.py:CatRecovCoreTest.test_daos_cat_recov_core - server was not found in its expected state - 17 TEST(S) FAILED'
Status is 'To Do'
Labels: 'ci_master_daily,daily_test,ci_2.6_daily'
https://daosio.atlassian.net/browse/DAOS-16170

@daosbuild1
Copy link
Collaborator

Test stage NLT on EL 8.8 completed with status UNSTABLE. https://build.hpdd.intel.com/job/daos-stack/job/daos//view/change-requests/job/PR-15477/1/testReport/

@daosbuild1
Copy link
Collaborator

Test stage Functional Hardware Medium Verbs Provider completed with status FAILURE. https://build.hpdd.intel.com//job/daos-stack/job/daos/view/change-requests/job/PR-15477/1/execution/node/1349/log

@Nasf-Fan Nasf-Fan changed the title DAOS-16170 chk: initialize local variable for CHK RPC - b26 DAOS-16170 cart: do not release completed RPC reference repeatedly - b26 Nov 9, 2024
@daosbuild1
Copy link
Collaborator

Test stage NLT on EL 8.8 completed with status UNSTABLE. https://build.hpdd.intel.com/job/daos-stack/job/daos//view/change-requests/job/PR-15477/2/testReport/

@daosbuild1
Copy link
Collaborator

Test stage NLT on EL 8.8 completed with status UNSTABLE. https://build.hpdd.intel.com/job/daos-stack/job/daos//view/change-requests/job/PR-15477/3/testReport/

For collective RPC, when handle failure cases during crt_req_send(),
its reference may has been released via crt_rpc_complete_and_unlock()
that is triggered by crt_corpc_complete(). Under such case, we should
check whether the RPC is completed or not before calling RPC_DECREF()
to avoid releasing the RPC reference repeatedly.

The patch also initializes some local variable for CHK RPC to avoid
accessing invalid DRAM when handle failed collective CHK RPC.

Some enhancement for CR test logic.

Test-tag: test_daos_cat_recov_core
Allow-unstable-test: true

Signed-off-by: Fan Yong <[email protected]>
@daosbuild1
Copy link
Collaborator

Test stage Unit Test with memcheck on EL 8.8 completed with status FAILURE. https://build.hpdd.intel.com/job/daos-stack/job/daos/job/PR-15477/4/display/redirect

@daosbuild1
Copy link
Collaborator

Test stage Unit Test bdev with memcheck on EL 8.8 completed with status FAILURE. https://build.hpdd.intel.com/job/daos-stack/job/daos/job/PR-15477/4/display/redirect

@daosbuild1
Copy link
Collaborator

Test stage Unit Test on EL 8.8 completed with status FAILURE. https://build.hpdd.intel.com/job/daos-stack/job/daos/job/PR-15477/4/display/redirect

@daosbuild1
Copy link
Collaborator

Test stage NLT on EL 8.8 completed with status FAILURE. https://build.hpdd.intel.com/job/daos-stack/job/daos/job/PR-15477/4/display/redirect

@daosbuild1
Copy link
Collaborator

Test stage Unit Test bdev on EL 8.8 completed with status FAILURE. https://build.hpdd.intel.com/job/daos-stack/job/daos/job/PR-15477/4/display/redirect

@daosbuild1
Copy link
Collaborator

Test stage NLT on EL 8.8 completed with status UNSTABLE. https://build.hpdd.intel.com/job/daos-stack/job/daos//view/change-requests/job/PR-15477/5/testReport/

@daosbuild1
Copy link
Collaborator

Test stage NLT on EL 8.8 completed with status UNSTABLE. https://build.hpdd.intel.com/job/daos-stack/job/daos//view/change-requests/job/PR-15477/6/testReport/

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment
Labels
None yet
Development

Successfully merging this pull request may close these issues.

2 participants