Skip to content

chore(deps): Update arrow-array requirement from 52 to 53 #264

chore(deps): Update arrow-array requirement from 52 to 53

chore(deps): Update arrow-array requirement from 52 to 53 #264

Triggered via pull request September 8, 2024 12:51
Status Failure
Total duration 1m 50s
Artifacts

bindings_python_ci.yml

on: pull_request
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

7 errors
check-rust
Process completed with exit code 101.
test (ubuntu-latest)
The process '/home/runner/work/_temp/45e0397a-7b26-4400-a39b-28c47253d54c/maturin' failed with exit code 1
test (macos-latest)
The job was canceled because "ubuntu-latest" failed.
test (macos-latest)
[notice] A new release of pip is available: 21.1.1 -> 24.2 [notice] To update, run: python3.8 -m pip install --upgrade pip
test (macos-latest)
The operation was canceled.
test (windows-latest)
The job was canceled because "ubuntu-latest" failed.
test (windows-latest)
The operation was canceled.