Skip to content

[FLINK-34545][cdc-pipeline-connector]Add OceanBase pipeline connector to Flink CDC #1006

[FLINK-34545][cdc-pipeline-connector]Add OceanBase pipeline connector to Flink CDC

[FLINK-34545][cdc-pipeline-connector]Add OceanBase pipeline connector to Flink CDC #1006

Re-run triggered July 10, 2024 15:28
Status Failure
Total duration 28m 25s
Artifacts

flink_cdc.yml

on: pull_request
Matrix: compile_and_test
Fit to window
Zoom out
Zoom in

Annotations

5 errors
compile_and_test (8, postgres)
Process completed with exit code 1.
compile_and_test (8, mysql)
The job was canceled because "_8_postgres" failed.
compile_and_test (8, mysql)
The operation was canceled.
compile_and_test (8, e2e)
The job was canceled because "_8_postgres" failed.
compile_and_test (8, e2e)
The operation was canceled.