[FLINK-35638] Refactor OceanBase test cases and remove dependency on host network #908
flink_cdc.yml
on: pull_request
license_check
2m 44s
migration_test
3m 15s
Matrix: compile_and_test
Annotations
13 errors
compile_and_test (8, pipeline_connectors)
Process completed with exit code 1.
|
compile_and_test (8, db2)
The job was canceled because "_8_pipeline_connectors" failed.
|
compile_and_test (8, db2)
The operation was canceled.
|
compile_and_test (8, mongodb)
The job was canceled because "_8_pipeline_connectors" failed.
|
compile_and_test (8, mongodb)
The operation was canceled.
|
compile_and_test (8, oracle)
The job was canceled because "_8_pipeline_connectors" failed.
|
compile_and_test (8, oracle)
The operation was canceled.
|
compile_and_test (8, mysql)
The job was canceled because "_8_pipeline_connectors" failed.
|
compile_and_test (8, mysql)
The operation was canceled.
|
compile_and_test (8, e2e)
The job was canceled because "_8_pipeline_connectors" failed.
|
compile_and_test (8, e2e)
The operation was canceled.
|
compile_and_test (8, postgres)
The job was canceled because "_8_pipeline_connectors" failed.
|
compile_and_test (8, postgres)
The operation was canceled.
|