Skip to content

Initial commit, to get started #5

Initial commit, to get started

Initial commit, to get started #5

Triggered via push November 7, 2023 23:37
Status Failure
Total duration 28s
Artifacts

php.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

6 errors
build (8.1)
Process completed with exit code 255.
build (8.0)
The job was canceled because "_8_1" failed.
build (8.0)
Your lock file does not contain a compatible set of packages. Please run composer update. Problem 1 - doctrine/instantiator is locked to version 2.0.0 and an update of this package was not requested. - doctrine/instantiator 2.0.0 requires php ^8.1 -> your php version (8.0.30) does not satisfy that requirement. Problem 2 - doctrine/lexer is locked to version 3.0.0 and an update of this package was not requested. - doctrine/lexer 3.0.0 requires php ^8.1 -> your php version (8.0.30) does not satisfy that requirement. Problem 3 - doctrine/lexer 3.0.0 requires php ^8.1 -> your php version (8.0.30) does not satisfy that requirement. - jms/serializer 3.28.0 requires doctrine/lexer ^2.0 || ^3.0 -> satisfiable by doctrine/lexer[3.0.0]. - jms/serializer is locked to version 3.28.0 and an update of this package was not requested.
build (8.0)
Process completed with exit code 2.
build (8.2)
The job was canceled because "_8_1" failed.
build (8.2)
The operation was canceled.