Skip to content

dev: bump gocloud.dev from 0.35.1-0.20231212005850-e86400ea404e to 0.36.0 #8155

dev: bump gocloud.dev from 0.35.1-0.20231212005850-e86400ea404e to 0.36.0

dev: bump gocloud.dev from 0.35.1-0.20231212005850-e86400ea404e to 0.36.0 #8155

Triggered via pull request January 1, 2024 22:30
Status Failure
Total duration 14m 36s
Artifacts 4

e2e.yml

on: pull_request
Determine if run is required
19s
Determine if run is required
Run preparations
5m 26s
Run preparations
Matrix: Main frontend end-to-end tests (Chrome)
Cross-browser smoke tests (Firefox 102.3.0 ESR)
4m 11s
Cross-browser smoke tests (Firefox 102.3.0 ESR)
Write result cache
0s
Write result cache
Fit to window
Zoom out
Zoom in

Annotations

13 errors
Determine if run is required
Process completed with exit code 1.
Main frontend end-to-end tests (Chrome) (4)
Process completed with exit code 2.
Main frontend end-to-end tests (Chrome) (4)
no matching workflow run found with any artifacts?
Main frontend end-to-end tests (Chrome) (2)
Cypress tests: 5 failed
Main frontend end-to-end tests (Chrome) (2)
Process completed with exit code 2.
Main frontend end-to-end tests (Chrome) (2)
no matching workflow run found with any artifacts?
Main frontend end-to-end tests (Chrome) (3)
Process completed with exit code 2.
Main frontend end-to-end tests (Chrome) (3)
no matching workflow run found with any artifacts?
Main frontend end-to-end tests (Chrome) (1)
The job was canceled because "_2" failed.
Main frontend end-to-end tests (Chrome) (1)
The operation was canceled.
Main frontend end-to-end tests (Chrome) (1)
no matching workflow run found with any artifacts?
Main frontend end-to-end tests (Chrome) (1)
Cypress tests: 5 failed
Main frontend end-to-end tests (Chrome) (1)
Process completed with exit code 2.

Artifacts

Produced during runtime
Name Size
build-files Expired
96.5 MB
cypress-failed-test-spec Expired
52 Bytes
cypress-screenshots Expired
1.21 MB
logs Expired
4.66 MB