Skip to content

Update dependency puppeteer to v14.4.1 #2907

Update dependency puppeteer to v14.4.1

Update dependency puppeteer to v14.4.1 #2907

Triggered via pull request September 14, 2024 01:16
Status Failure
Total duration 28s
Artifacts

nodejs-ci.yml

on: pull_request
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

9 errors
test (20.x): tests/integration/controller.test.ts#L39
'response' is possibly 'null'.
test (20.x): tests/integration/controller.test.ts#L52
'response' is possibly 'null'.
test (20.x)
Process completed with exit code 2.
test (18.x)
The job was canceled because "_20_x" failed.
test (18.x): tests/integration/controller.test.ts#L39
'response' is possibly 'null'.
test (18.x): tests/integration/controller.test.ts#L52
'response' is possibly 'null'.
test (18.x)
Process completed with exit code 2.
test (16.x)
The job was canceled because "_20_x" failed.
test (16.x)
The operation was canceled.