Skip to content

Fix get route performance #145

Fix get route performance

Fix get route performance #145

Triggered via pull request October 17, 2024 15:43
Status Failure
Total duration 42s
Artifacts

go.yml

on: pull_request
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors
build (1.19)
Process completed with exit code 2.
build (1.21)
The job was canceled because "_1_19" failed.
build (1.21)
Process completed with exit code 2.
build (1.20)
The job was canceled because "_1_19" failed.
build (1.20)
The operation was canceled.