-
Notifications
You must be signed in to change notification settings - Fork 9
MEP825
N3h3miah edited this page Jan 3, 2015
·
1 revision
The MSL-825 has a platform for material studies in space and a robotic arm for sample manipulation. In launch configuration is the exposure platform retracted. The robotic arm can fail to fix it a Kerbal must go on a EVA to fix the arm.
####Stats: Production: 1 ExposureTime per hour
Crew capacity: 1
Minimal crew: 0
Needed tech: Advanced Construction
Enty Cost: 7000
Cost: 3200
Mass: 12