Skip to content

Check Ray version compatibility #710

Check Ray version compatibility

Check Ray version compatibility #710

Triggered via schedule October 3, 2024 00:08
Status Failure
Total duration 15m 28s
Artifacts

ray-compatibility.yml

on: schedule
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

12 errors
build (3.9, 2.5.1)
The job running on runner GitHub Actions 9 has exceeded the maximum execution time of 15 minutes.
build (3.9, 2.5.1)
The operation was canceled.
build (3.9, 2.3.0)
The job running on runner GitHub Actions 35 has exceeded the maximum execution time of 15 minutes.
build (3.9, 2.3.0)
The operation was canceled.
build (3.9, 2.4.0)
The job running on runner GitHub Actions 31 has exceeded the maximum execution time of 15 minutes.
build (3.9, 2.4.0)
The operation was canceled.
build (3.9, 2.2.0)
The job running on runner GitHub Actions 2 has exceeded the maximum execution time of 15 minutes.
build (3.9, 2.2.0)
The operation was canceled.
build (3.9, 2.0.0)
The job running on runner GitHub Actions 14 has exceeded the maximum execution time of 15 minutes.
build (3.9, 2.0.0)
The operation was canceled.
build (3.9, 2.1.0)
The job running on runner GitHub Actions 6 has exceeded the maximum execution time of 15 minutes.
build (3.9, 2.1.0)
The operation was canceled.