Skip to content

Commit

Permalink
Update forward_structure.rst
Browse files Browse the repository at this point in the history
  • Loading branch information
asjeb authored Sep 18, 2024
1 parent 156be28 commit cb84f79
Showing 1 changed file with 3 additions and 3 deletions.
6 changes: 3 additions & 3 deletions doc/source/math_num_documentation/forward_structure.rst
Original file line number Diff line number Diff line change
Expand Up @@ -362,8 +362,8 @@ Hydrological processes can be described at pixel scale in `smash` with one of th
**Production**


In the classical gr production reservoir formulation, the instantaneous production rate is the ratio between the state and the capacity of the reservoir :
:math:`\eta = \left( \frac{h_p}{c_p} \right)^2`. The integration of the complementary of :math:`\eta` the rainfall infiltration :math:`p_s`.
In the classical gr production reservoir formulation, the instantaneous production rate is the ratio between the state and the capacity of the reservoir,
:math:`\eta = \left( \frac{h_p}{c_p} \right)^2`. The infiltration flux :math:p_s is obtained by temporal integration as follows:

.. math::
:nowrap:
Expand All @@ -374,7 +374,7 @@ Hydrological processes can be described at pixel scale in `smash` with one of th
\end{eqnarray}
We assume that the production reservoir receives a rainfall of :math:`p_n` at time :math:`t`, then
Assuming the neutralized rainfall :math:p_n constant over the current time step and thanks to analytically integrable function, the infiltration flux into the production reservoir is obtained:

.. math::
:nowrap:
Expand Down

0 comments on commit cb84f79

Please sign in to comment.