Skip to content

CI + CD for staging and prod #6

CI + CD for staging and prod

CI + CD for staging and prod #6

Manually triggered September 12, 2023 12:38
Status Cancelled
Total duration 7m 45s
Artifacts 3

deployment-stage-prod.yml

on: workflow_dispatch
Continuous integration  /  Tests: API
7m 34s
Continuous integration / Tests: API
Continuous integration  /  Tests: Frontend
3m 14s
Continuous integration / Tests: Frontend
Continuous integration  /  Tests: Print
1m 57s
Continuous integration / Tests: Print
Continuous integration  /  Lint: ClientPrint (ESLint)
21s
Continuous integration / Lint: ClientPrint (ESLint)
Continuous integration  /  Lint: API (php-cs-fixer)
54s
Continuous integration / Lint: API (php-cs-fixer)
Continuous integration  /  Lint: Frontend (ESLint)
50s
Continuous integration / Lint: Frontend (ESLint)
Continuous integration  /  Lint: Print (ESLint)
47s
Continuous integration / Lint: Print (ESLint)
Continuous integration  /  Lint: e2e (Prettier)
24s
Continuous integration / Lint: e2e (Prettier)
Continuous integration  /  Tests: End-to-end (build job)
1m 40s
Continuous integration / Tests: End-to-end (build job)
Continuous integration  /  Finish coveralls report
0s
Continuous integration / Finish coveralls report
Matrix: Continuous integration / Tests: End-to-end
Continuous integration  /  Send out CI success event
0s
Continuous integration / Send out CI success event
Build and push docker images  /  Build images and push
Build and push docker images / Build images and push
Upgrade or install deployment  /  Upgrade or install deployment
Upgrade or install deployment / Upgrade or install deployment
Fit to window
Zoom out
Zoom in

Annotations

8 errors and 1 warning
Continuous integration / Tests: End-to-end (chrome)
The run was canceled by @BacLuc.
Continuous integration / Tests: End-to-end (chrome)
The operation was canceled.
Continuous integration / Tests: End-to-end (edge)
The run was canceled by @BacLuc.
Continuous integration / Tests: End-to-end (edge)
The operation was canceled.
Continuous integration / Tests: End-to-end (firefox)
The run was canceled by @BacLuc.
Continuous integration / Tests: End-to-end (firefox)
The operation was canceled.
Continuous integration / Tests: API
The run was canceled by @BacLuc.
Continuous integration / Tests: API
The operation was canceled.
Continuous integration / Tests: End-to-end (chrome)
No files were found with the provided path: e2e/data/**/*. No artifacts will be uploaded.

Artifacts

Produced during runtime
Name Size
cypress-output-edge Expired
881 KB
cypress-output-firefox Expired
881 KB
e2e-tests-images Expired
91.2 MB