Operational model for the simulation of tidal range power plants.
The aim of this project is to include short examples for the simulation of tidal range power plants through a 0-D modelling technique. A finite difference approach is used to simulate the project in time.
The main principles, formulations and applications of this work have been reported in several studies, beginning with:
Optimising tidal range power plant operation. A Angeloudis, S.C Kramer, A. Avdis, M.D. Piggott. Applied Energy, Volume 212, 15 February 2018, Pages 680-690. https://www.sciencedirect.com/science/article/pii/S0306261917317671
The development of the tools has been funded by EPSRC (EP/K503733/1) and NERC (EP/K503733/2) research at the University of Edinburgh and Imperial College London.