diff --git a/construction/2008/08/c080801.htm b/construction/2008/08/c080801.htm deleted file mode 100644 index 7eb4b3f..0000000 --- a/construction/2008/08/c080801.htm +++ /dev/null @@ -1,588 +0,0 @@ - - - - - - -c080801: Orcmid's Lair Site Repaving - - - - - -
- - - - - - - - - - -
- - -Orcmid 1956 SL mirror selfie - - -
-  
-

- c080801 - Orcmid's Lair Construction Note
- Site Repaving

-
- - -

- - orcmid>construction>
- 2008>08>

- -

- c080801>
- - - 0.00 2023-08-28 19:26 -0700

- -
-
-
- -

The Orcmid's Lair is being repaved to correct for defects that resulted from -moving to a different web server.  At the same time, obsolete styles and -organizations of material are being replaced.  This is a typical repaving -performed to an existing nfoCentrale site.  An example of the -complete approach for a newly-created site is illustrated by the - -bootstrapping project on the -nfoWorks -site.

-

An additional problem to be dealt with, somewhat concurrently, is upgrading -of the site pages to conform to web standards well enough to be properly viewed -using Microsoft Internet Explorer 8.  Following that, there will also be -accessibility provisions to consider.  For all of this, making changes more -amenable to simple crank-turning is also a concern.

-

{author note: The following material is boilerplate -and remains to be customized for specific usage in repaving of Orcmid's Lair}

- -
-
-
- - - -

1. Repaving
- 2. Work Items and Repaving Progress
- 3. Reporting Defects
- 4. Making Insertions
- 5. Related Material

-
-
-
- -
- - 
-

1. -Repaving

-
-

Repaving of NuovoDoc involves introduction of a construction - structure that is now being used for all - nfoCentrale sites.  The - construction structure provides scaffolding on which the unique content for - NuovoDoc is developed and maintained in a systematic - way.  The repaving of the construction structure provides the framework - for promulgating the repaving work throughout the site.  It also - provides identification of where and how much repaving remains to be done - and where repaving has been completed.

-

Repaving starts by updates to basic construction structure and construction - materials needed for further development.  The basic infrastructure of - the site is repaved first:

-
-

NuovoDoc.com - / ---   root - construction structure and root - construction zone
-                 - |
-                - -- _private/
-                - |
-                - -- cgi-bin/
(not viewable)
-                - |
-                - -- construction/
-                - |
-                - -- images/

-
-

Repaving is extended to the remaining sections of the site - in a progressive way, concentrating on the most-used materials first.  For - NuovoDoc, the progression is through the following sections:

-
-

                - |
-                - -- info/
-                 - |
-                - -- products/
-                 - |
-                - -- analysis/
-                 - |
-                - -- activities/
-                 - |
-                - -- architettura/

-
-

Repaving is a manual process.  In order to keep track - of the repaving status and progress, notices are placed throughout - the construction structure and in lists of - work items (e.g., on any Job Jar & Diary - page) that reflect the local repaving (and later-maintenance) status.  - This serves three important purposes:

- -

The customization process begins at the front porch of the - site.  It is propagated from there down into the infrastructure and - content sections as they are introduced.  The complete bootstrapping - progress of all components of the site can be reviewed by navigation from - the root construction structure - page.

-
-

2. - Work Items and Bootstrap Progress

-
-

There is a progression of work items being followed to - extend the construction structure information through all of the initial - folders.  This can be found in the top-level construction zone - Diary & Job Jar table. 

-

Essentially, the initial material is adjusted starting from - the root of the site and working to the leaves of the initial folders.  - As the material is customized, notices are inserted in the pages of - infrastructure to reflect their bootstrapping status.  

-

The initial notice is in red text.  It indicates that - the transformation to the correct form and content is incomplete.

-

As construction structure and construction materials are - customized for this site, the notices in the material are changed to ones - with green text.  These notices indicate which aspect of the material - at that point and below is now in correct form: construction structure and - content material.

-

For new material that is introduced following the initial - bootstrap, a different green-text notice is used to indicate that this - material is created in the proper form from the beginning. 

-

The different notices and their usage are illustrated here - on the 2008-06-04 Announcement page.

-

The overall rolling-wave through the site structure is - illustrated in the progressive modifications of the following table:

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
- Table 1.  Repaving Status
- backgrounds: white - pending, red - in progress, blue - - completed
LevelConstituentStatus Date
- Front PorchConstruction Structure - 2008-07-19
  - Construction Zone - 2008-07-19
_privateConstruction Structure2008-07-20
activitiesConstruction Structure 
analysisConstruction Structure 
architetturaConstruction Structure 
- cgi-binConstruction Structure2008-07-20
- - constructionConstruction Structure - 2008-06-24
  - Construction Zone - 2008-07-20
- 2008Construction Structure2008-06-24
- 06Construction Structure2008-06-24
   - c0806012008-06-24
- templatesConstruction Structure2008-06-24
  - - 00Construction Structure2008-06-24
    - c0000022008-06-24
    - c0000032008-06-24
    - c0000042008-06-24
    - c0000052008-06-24
    - c0000062008-06-24
- imagesConstruction Structure2008-07-20
- infoConstruction Structure - 2008-07-20
  - Construction Zone - 2008-07-20
1999Construction Structure 
05Construction Structure 
2005Construction Structure 
12Construction Structure 
2007Construction Structure 
 03Construction Structure 
productsConstruction Structure 
  Construction Zone 
-
- -

3. - Reporting Defects 

-
-

Any defect encountered in content, - construction structure, and links (internal and external) - can be reported to the technical coordinator

-

If you are curious what defects are already identified, you - can inspect the lists of known work items that are maintained throughout the - site:

- -
-

4. -Making Insertions

-
-

Using Microsoft Office FrontPage 2003, the current - announcement may be inserted into any number of site pages.  Insertion - is by using the FrontPage extensions "Include Page" web component.  The - FrontPage operation is performed using the current Include Page.  - That - Include Page provides a single-cell table element that accomplishes three purposes:

-
    -
  1. -

    The announcement provides a link to a - document-engineering page (such as this one) where more detail of the - repaving-project status may be found. 

  2. -
  3. -

    The FrontPage 2003 Hyperlinks View provides a way to - know where the announcement is currently placed as it is appropriate to - remove it from some pages and add it to others.

  4. -
  5. -

    Maintenance of the insertion is performed in a single - place and automatically reflected in all of the places the announcement - has been inserted.

  6. -
-

-

-

The link in the caption beneath the cell provides access - to the corresponding document-engineering page and its explanation.

-
-

For further information on how this approach to Include - Content is performed, see the template article page - c000006c: ClustrMap Insertion - FrontPage Document Engineering.

-
- -

5. - Related Material

- - -
-
- - - - - -
-
Attribution:
-
-
-
-
Hamilton, Dennis E.
-
Site Repaving.   Orcmid's Lair Construction Materials Note  - c080801 0.00, - August 29, 2008.  Available at <http://orcmid.com/construction/2008/08/c080801.htm>.
-
- - -
Revision History:
- -
0.00 2008-08-29-09:47 Create - Folio Cover-Page Placeholder
- -
Customize just enough for provisional Orcmid's Lair repaving use.  Clean it up - later.  The NuovoDoc repaving folio c080601 is used as the boilerplate - to be adapted.
-
- -
-
- - - - - - - -
- - Construction Structure (Hard Hat Area) - -

- -You are navigating
-Orcmid's Lair -construction material.

-
-

created 2008-08-28-18:38 -0700 (pdt) by - orcmid -
-$$Author: Orcmid $
-$$Date: 22-05-06 16:35 $
-$$Revision: 117 $

-
- - - - diff --git a/construction/2008/08/c080801a.htm b/construction/2008/08/c080801a.htm deleted file mode 100644 index b1d3f6c..0000000 --- a/construction/2008/08/c080801a.htm +++ /dev/null @@ -1,420 +0,0 @@ - - - - - - - -c080801a: Site Repaving -  Diary & Job Jar - - - - - - - - - - - - - - - - - - - -
- - - - -Orcmid 1956 SL mirror selfie - - -

- - - - -c080801 -Orcmid's Lair Construction Note
-
Site Repaving
-
-
- - - Diary & Job Jar

-
- - - - - -

- - orcmid>construction>
- 2008>08>

- -

- c080801a>
- - - 0.00 2023-08-28 19:26 -0700

-
-
-
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
-

Status

-
-

Date

-
-

Description

-
-   - 2008-08-29 -
- - - - - - - - -
- - - Orcmid's Lair> repaving> 2008-08-29 announcement>
-


Orcmid's Lair Is - Being Repaved.

-
-

The Orcmid's Lair site - is being repaved to correct problems resulting from movement - to a new web server.   - At the same time, the site is being adjusted to use the - latest styles and formats that are applicable to this and - other sites of the nfoCentrale.net family.

-

Check the - Site Repaving Project - pages for additional details on the approach to repaving and its tracking.  - Contact the - - - technical coordinator with questions and to - report any defects that you notice.

-
-

 

- -
-
-
- This applies to the entire site as of this date.
-
   
   
   
   
   
 2010-04-02Work down the - path to BlunderNotes so I can work over the blogs first, or at least - while I am doing that.  I need a way to have BlunderNotes that I - can use to manage the unification of templates and then the experimental - adjustments to get onto a different blog engine, such as a self-hosted - Movable Type.
 2008-08-29c080601: - Re-align the tree structure in Table 1 to be uniform and nicely - left-justified
-  2008-08-29Foyer: Do the - breadth-first spread through the top-level subordinates, managing from - the Front Porch Construction Zone
 2008-08-29c080801c: The - different inserts should list the nature of the style inclusions.  - It is going to be important to repave construction/templates/00/ with - the information that applies to styles.  For normal documents, - there are important styles for catalogs, diary & job jars, etc. There - need to be templates for folios (that would handle some of this) too.  - Some of this could be at the nfoCentrale.net level also. [dh:2008-06-24 - There is enough information here on the bootstrapping and the notices.  - The notices might link to the relevant sections of the construction - templates, when those indicate the rules being followed.  That is - not urgent.][dh:2008-08-29 Borrow from other sites, such as NuovoDoc.com - depending on who gets this first.]
-   - 2008-08-29 - "Go green" all the way to the foyer - when the template customizations are complete
-   - 2008-08-29 - Review and customize c000005
-   - 2008-08-29 - Review and customize c000004
-   - 2008-08-29 - Review and customize c000003
-   - 2008-08-29 - Conduct review of the Construction Material - content, operating from that - Construction Zone
-   - 2008-08-29 - Identify repaving status in - all of the construction structure - starting from the front-porch - Construction Zone - as repaving moves into all of the initial sections.   index.htm, - cgi-bin/index.htm, - _private/index.htm, construction/index.htm, images/index.htm, etc.
-  2008-08-29 - Foyer: Start the Construction Zone
-  2008-08-29Foyer: Start the - Construction Structure
-   - 2008-08-29 - Review and customize c000006
-  2008-08-29c080801: Revamp - text to apply to repaving
- done2008-08-29 -
- - - - - - -
-
-


- This material conforms to the -
- 2008-08-29 - styles for - - Site - Repaving.  Check those - pages for additional details of the approach and the styles. 
- Contact the - - technical coordinator with questions and to - report any defects that you notice.

-
-
-
-

This notice applies to this folio.  It - signifies that the pages of this folio are of correct form and - customized for - this site.

- done2008-08-29 - - Verify that the construction structure is stitched - through this folio correctly, allowing that part to be marked as - completed.
- done2008-08-29c080601c: - Revamp text to apply to this repaving
- done2008-08-29 - - Identify this material as being repaved with the - c080801b1 include page.
- done2008-08-29 - Create placeholder ready for further customization to - make the Orcmid's Lair Site Repaving project: c080801, - c080801a, c080801b, c080801c, c080801c1, c080801b1, c080801c2, - c080801c3, c080801c4
- done2008-08-29 - Modify the include-page items in order to have them be - usable immediately even though other content of this folio is mostly - placeholders and unmodified boilerplate: c080801b1, c080801c1, - c080801c2, c080801c3, c080801c4
- done
- 2008-08-29
- 2008-08-28 -

Customize this page for immediate usage. 

- - -
-
Revision History:
-
0.00 2008-08-29-09:57 Create Bootstrap - Placeholder
-
Customize for immediate use in repaving the site, with further - customization of this folio to follow.
- -
- -
- - - - - - - -
- - Construction Structure (Hard Hat Area) - -

- -You are navigating
-Orcmid's Lair -construction material.

-
-

created 2008-08-28-18:38 -0700 (pdt) by - orcmid -
-$$Author: Orcmid $
-$$Date: 22-05-06 16:35 $
-$$Revision: 113 $

-
- - - diff --git a/construction/2008/08/c080801b.htm b/construction/2008/08/c080801b.htm deleted file mode 100644 index 0328df0..0000000 --- a/construction/2008/08/c080801b.htm +++ /dev/null @@ -1,379 +0,0 @@ - - - - - - - -c080801b: Orcmid's Lair Site Repaving [current status] - - - - - - - - -
- - - - - - - - - - - - -
- - -Orcmid 1956 SL mirror selfie - -

- - - - -c080801 -Orcmid's Lair Construction Note
-
Site Repaving
-
-
- 2008-08-29 Announcement

-
- - - - - -

- - orcmid>construction>
- 2008>08>

- -

- c080801c>
- - - 0.00 2023-08-28 19:26 -0700

-
-
-
-
-
- -
- - - -
-
-
-
- -
- -

-

1. -Announcement Inserts

-

1.1 Area Undergoing -Repaving

-
- - - - - - - -
- - - Orcmid's Lair> repaving> 2008-08-29 announcement>
-


Orcmid's Lair Is - Being Repaved.

-
-

The Orcmid's Lair site - is being repaved to correct problems resulting from movement - to a new web server.   - At the same time, the site is being adjusted to use the - latest styles and formats that are applicable to this and - other sites of the nfoCentrale.net family.

-

Check the - Site Repaving Project - pages for additional details on the approach to repaving and its tracking.  - Contact the - - - technical coordinator with questions and to - report any defects that you notice.

-
-

 

-
-

The basic notice is used for notification in all - locations where customization of material is needed before the repaving - is complete.  This notice applies to the level at which it appears - and all levels deeper than that.  It cannot be removed until the - current level and all lower levels are complete.  If there is - content as well as construction structure at or below a given level, - this notice is not removed until the repaving of both are - complete and so indicated.

-
-

1.2 Completed - Construction Structure Repaving

- - - - - - -
-
-


- This Construction Structure was successfully customized as part of the -
- 2008-08-29 - stage of - - Site Repaving.  Check those - pages for additional details of the approach to customization. 
- Contact the - - technical coordinator with questions and to - report any defects that you notice.

-
-
-
-

This insertion amends/replaces the announcement - insertion when the construction structures at the point of insertion and - for all deeper levels have been repaved.

-
-

1.3 Completed - Content Material Bootstrap

-
- - - - - - -
-
-


- The Content Material here was successfully customized as part of the -
- 2008-08-29 - stage of - - Site Repaving.  - Check those pages for additional details of the approach to - repaving and customization. 
- Contact the - - technical coordinator with questions and to - report any defects that you notice.

-
-
-

- This insertion amends/replaces the announcement insertion when the content - material governed by a job jar, a Construction Structure page, or a - Construction Zone has been repaved.  On a Construction Structure - page, this applies to immediate content.

-
-

1.4 Conforms to - Current Structure

-
- - - - - - -
-
-


- This material conforms to the -
- 2008-08-29 - styles for - - Site - Repaving.  Check those - pages for additional details of the approach and the styles. 
- Contact the - - technical coordinator with questions and to - report any defects that you notice.

-
-
-

- This insertion is used with new material that is created directly on the - site is "born conformant" with regard to this repaving's requirements.

-

- Because the pages having these notices can be located by checking for - all hyperlinks to the include pages, it is easy to determine what areas - need to be revisited and reviewed in a new wave of modifications, and to - then track the percolation of changes to those materials.

-
-
-

2. -Approach 

-
-
    -
  1. -

    The first priority is to have the - construction structure of the site be - current and properly connected. 

    -
      -
    • -

      This is accomplished by performing a review starting - with the foyer or "front porch," the root materials at - http://orcmid.com/.  - Work items and their completion will be reported as part of the - front-porch Construction Zone.

    • -
    • -

      After the front porch is adjusted, the construction - structure of each subfolder is reviewed, extending recursively - through all of the construction-structure elements only.    - Additional items that happen to be noticed will be added to the work - items of the applicable construction zone. 

    • -
    • -

      The construction structure and the related - construction zones can be located by navigating the - construction structure provided at - the front porch, once the repaving wave is begun there.

    • -
    • -

      When the construction structure is reviewed and - adjusted as necessary, a completion message will be inserted to - avoid wondering which structures have and have not been reviewed.
      -  

    • -
    -
  2. -
  3. -

    The second priority is to have enough Construction - Material be consistent, - reachable, and providing the proper templates. 

    -
      -
    • -

      It is not necessary to rush customization of - material that is used only by the web master, so long as the - material that visitors see on main content pages is correct. 

    • -
    • -

      Template materials will be correct, but the - descriptive material for their use might not be updated until - more-urgent content is provided.
         

    • -
    -
  4. -
  5. -

    The third priority is to have a correct Readings Section - Available for Use.  The readings/ section needs to be repaved - for consistent use and continued reference by many visitors.  It is - important to have the new style everywhere.
    -   

  6. -
  7. -

    The remaining sections will be repaved in the correct - style and format for the site.  These will usually be simpler.  - The blog folders have a great deal of construction structure to update, - but very little content needs to be edited directly.  The viaggio - and writings sections, and some others, require more extensive review - and update.

  8. -
-
- -
-
- - - - - -
-
Attribution:
-
-
-
-
Hamilton, Dennis E.
-
Site Repaving 2008-08-29 Announcement.   Orcmid's Lair Construction - Materials Note  c080801c 0.00, - August 29, 2008.  Available at <http://orcmid.com/construction/2008/08/c080801c.htm>.
-
- - -
Revision History:
-
0.00 - 2008-08-29-11:03 - Create Initial Announcement Placeholder
- -
This page is fully customized for the Orcmid's Lair 2008-08-29 Repaving - Announcement and the related include-page material.
-
- -
-
- - - - - - - -
- - Construction Structure (Hard Hat Area) - -

- -You are navigating
-Orcmid's Lair -construction material.

-
-

created 2008-08-28-18:38 -0700 (pdt) by - orcmid -
-$$Author: Orcmid $
-$$Date: 22-05-06 16:35 $
-$$Revision: 126 $

-
- - - - diff --git a/construction/2008/08/c080801b1.htm b/construction/2008/08/c080801b1.htm deleted file mode 100644 index 4ec21d4..0000000 --- a/construction/2008/08/c080801b1.htm +++ /dev/null @@ -1,62 +0,0 @@ - - - - - - - -c080801b1: Orcmid's Lair Repaving Announcement [current] - - - - - - - - - - - - - -
- - - Orcmid's Lair> repaving> 2008-08-29 announcement>
-


Orcmid's Lair Is - Being Repaved.

-
-

The Orcmid's Lair site - is being repaved to correct problems resulting from movement - to a new web server.   - At the same time, the site is being adjusted to use the - latest styles and formats that are applicable to this and - other sites of the nfoCentrale.net family.

-

Check the - Site Repaving Project - pages for additional details on the approach to repaving and its tracking.  - Contact the - - - technical coordinator with questions and to - report any defects that you notice.

-
-

 

- - - - - - - diff --git a/construction/2008/08/c080801c.htm b/construction/2008/08/c080801c.htm deleted file mode 100644 index e6e7174..0000000 --- a/construction/2008/08/c080801c.htm +++ /dev/null @@ -1,376 +0,0 @@ - - - - - - - -c080801c: Site Repaving 2008-08-29 Announcement - - - - - -
- - - - - - - - - - - - -
- - -Orcmid 1956 SL mirror selfie - -

- - - - -c080801 -Orcmid's Lair Construction Note
-
Site Repaving
-
-
- 2008-08-29 Announcement

-
- - - - - -

- - orcmid>construction>
- 2008>08>

- -

- c080801c>
- - - 0.00 2023-08-28 19:26 -0700

-
-
-
-
-
- -
- - - -
-
-
-
- -
- -

-

1. -Announcement Inserts

-

1.1 Area Undergoing -Repaving

-
- - - - - - - -
- - - Orcmid's Lair> repaving> 2008-08-29 announcement>
-


Orcmid's Lair Is - Being Repaved.

-
-

The Orcmid's Lair site - is being repaved to correct problems resulting from movement - to a new web server.   - At the same time, the site is being adjusted to use the - latest styles and formats that are applicable to this and - other sites of the nfoCentrale.net family.

-

Check the - Site Repaving Project - pages for additional details on the approach to repaving and its tracking.  - Contact the - - - technical coordinator with questions and to - report any defects that you notice.

-
-

 

-
-

The basic notice is used for notification in all - locations where customization of material is needed before the repaving - is complete.  This notice applies to the level at which it appears - and all levels deeper than that.  It cannot be removed until the - current level and all lower levels are complete.  If there is - content as well as construction structure at or below a given level, - this notice is not removed until the repaving of both are - complete and so indicated.

-
-

1.2 Completed - Construction Structure Repaving

- - - - - - -
-
-


- This Construction Structure was successfully customized as part of the -
- 2008-08-29 - stage of - - Site Repaving.  Check those - pages for additional details of the approach to customization. 
- Contact the - - technical coordinator with questions and to - report any defects that you notice.

-
-
-
-

This insertion amends/replaces the announcement - insertion when the construction structures at the point of insertion and - for all deeper levels have been repaved.

-
-

1.3 Completed - Content Material Bootstrap

-
- - - - - - -
-
-


- The Content Material here was successfully customized as part of the -
- 2008-08-29 - stage of - - Site Repaving.  - Check those pages for additional details of the approach to - repaving and customization. 
- Contact the - - technical coordinator with questions and to - report any defects that you notice.

-
-
-

- This insertion amends/replaces the announcement insertion when the content - material governed by a job jar, a Construction Structure page, or a - Construction Zone has been repaved.  On a Construction Structure - page, this applies to immediate content.

-
-

1.4 Conforms to - Current Structure

-
- - - - - - -
-
-


- This material conforms to the -
- 2008-08-29 - styles for - - Site - Repaving.  Check those - pages for additional details of the approach and the styles. 
- Contact the - - technical coordinator with questions and to - report any defects that you notice.

-
-
-

- This insertion is used with new material that is created directly on the - site is "born conformant" with regard to this repaving's requirements.

-

- Because the pages having these notices can be located by checking for - all hyperlinks to the include pages, it is easy to determine what areas - need to be revisited and reviewed in a new wave of modifications, and to - then track the percolation of changes to those materials.

-
-
-

2. -Approach 

-
-
    -
  1. -

    The first priority is to have the - construction structure of the site be - current and properly connected. 

    -
      -
    • -

      This is accomplished by performing a review starting - with the foyer or "front porch," the root materials at - http://orcmid.com/.  - Work items and their completion will be reported as part of the - front-porch Construction Zone.

    • -
    • -

      After the front porch is adjusted, the construction - structure of each subfolder is reviewed, extending recursively - through all of the construction-structure elements only.    - Additional items that happen to be noticed will be added to the work - items of the applicable construction zone. 

    • -
    • -

      The construction structure and the related - construction zones can be located by navigating the - construction structure provided at - the front porch, once the repaving wave is begun there.

    • -
    • -

      When the construction structure is reviewed and - adjusted as necessary, a completion message will be inserted to - avoid wondering which structures have and have not been reviewed.
      -  

    • -
    -
  2. -
  3. -

    The second priority is to have enough Construction - Material be consistent, - reachable, and providing the proper templates. 

    -
      -
    • -

      It is not necessary to rush customization of - material that is used only by the web master, so long as the - material that visitors see on main content pages is correct. 

    • -
    • -

      Template materials will be correct, but the - descriptive material for their use might not be updated until - more-urgent content is provided.
         

    • -
    -
  4. -
  5. -

    The third priority is to have a correct Readings Section - Available for Use.  The readings/ section needs to be repaved - for consistent use and continued reference by many visitors.  It is - important to have the new style everywhere.
    -   

  6. -
  7. -

    The remaining sections will be repaved in the correct - style and format for the site.  These will usually be simpler.  - The blog folders have a great deal of construction structure to update, - but very little content needs to be edited directly.  The viaggio - and writings sections, and some others, require more extensive review - and update.

  8. -
-
- -
-
- - - - - -
-
Attribution:
-
-
-
-
Hamilton, Dennis E.
-
Site Repaving 2008-08-29 Announcement.   Orcmid's Lair Construction - Materials Note  c080801c 0.00, - August 29, 2008.  Available at <http://orcmid.com/construction/2008/08/c080801c.htm>.
-
- - -
Revision History:
-
0.00 - 2008-08-29-11:03 - Create Initial Announcement Placeholder
- -
This page is fully customized for the Orcmid's Lair 2008-08-29 Repaving - Announcement and the related include-page material.
-
- -
-
- - - - - - - -
- - Construction Structure (Hard Hat Area) - -

- -You are navigating
-Orcmid's Lair -construction material.

-
-

created 2008-08-28-18:38 -0700 (pdt) by - orcmid -
-$$Author: Orcmid $
-$$Date: 22-05-06 16:35 $
-$$Revision: 126 $

-
- - - diff --git a/construction/2008/08/c080801c1.htm b/construction/2008/08/c080801c1.htm deleted file mode 100644 index 465c87d..0000000 --- a/construction/2008/08/c080801c1.htm +++ /dev/null @@ -1,60 +0,0 @@ - - - - - - - -c080801c1: 2008-08-29 Orcmid's Lair Repaving Announcement - - - - - - - - - - - - -
- - - Orcmid's Lair> repaving> 2008-08-29 announcement>
-


Orcmid's Lair Is - Being Repaved.

-
-

The Orcmid's Lair site - is being repaved to correct problems resulting from movement - to a new web server.   - At the same time, the site is being adjusted to use the - latest styles and formats that are applicable to this and - other sites of the nfoCentrale.net family.

-

Check the - Site Repaving Project - pages for additional details on the approach to repaving and its tracking.  - Contact the - - - technical coordinator with questions and to - report any defects that you notice.

-
-

 

- - - - - - diff --git a/construction/2008/08/c080801c2.htm b/construction/2008/08/c080801c2.htm deleted file mode 100644 index cb3c9a3..0000000 --- a/construction/2008/08/c080801c2.htm +++ /dev/null @@ -1,52 +0,0 @@ - - - - - - - -c080801c2: Construction Structure Repaved - - - - - - - - - - - -
-
-


- This Construction Structure was successfully customized as part of the -
- 2008-08-29 - stage of - - Site Repaving.  Check those - pages for additional details of the approach to customization. 
- Contact the - - technical coordinator with questions and to - report any defects that you notice.

-
-
- - - - - - diff --git a/construction/2008/08/c080801c3.htm b/construction/2008/08/c080801c3.htm deleted file mode 100644 index 8c7a9ad..0000000 --- a/construction/2008/08/c080801c3.htm +++ /dev/null @@ -1,53 +0,0 @@ - - - - - - - -c080801c3: Content Material Repaved - - - - - - - - - - - -
-
-


- The Content Material here was successfully customized as part of the -
- 2008-08-29 - stage of - - Site Repaving.  - Check those pages for additional details of the approach to - repaving and customization. 
- Contact the - - technical coordinator with questions and to - report any defects that you notice.

-
-
- - - - - - diff --git a/construction/2008/08/c080801c4.htm b/construction/2008/08/c080801c4.htm deleted file mode 100644 index 8a84be8..0000000 --- a/construction/2008/08/c080801c4.htm +++ /dev/null @@ -1,53 +0,0 @@ - - - - - - - -c080801c4: Conforms to Repaving Style - - - - - - - - - - - -
-
-


- This material conforms to the -
- 2008-08-29 - styles for - - Site - Repaving.  Check those - pages for additional details of the approach and the styles. 
- Contact the - - technical coordinator with questions and to - report any defects that you notice.

-
-
- - - - - - diff --git a/construction/2008/08/index.htm b/construction/2008/08/index.htm deleted file mode 100644 index 8099fcc..0000000 --- a/construction/2008/08/index.htm +++ /dev/null @@ -1,146 +0,0 @@ - - - - - - -Orcmid's Lair /construction/2008/08/ Construction Structure - - - - - - - - - - - - - -
- - -Orcmid 1956 SL mirror selfie width= - -

- - construction/2008/08/
-
-
- - Construction Structure

-
- -

- - orcmid>construction>
- 2008>08>

-

- index.htm>
-  2023-08-28 19:26 -0700 -

-
- - - - - - - - - - - - - - - - - - - - - - -
Superior Structure: - Orcmid's Lair - construction/2008/ Construction Structure
- Orcmid's Lair Construction - Material Construction Zone
Local Infrastructure:       - index.htm - - Orcmid's Lair - construction/2008/08/ Construction - Structure (this page)
Immediate Content:[via catalog]
Subordinate Structure:[none]
- Status: -
- - - - - - -
-
-


- This material conforms to the -
- 2008-08-29 - styles for - - Site - Repaving.  Check those - pages for additional details of the approach and the styles. 
- Contact the - - technical coordinator with questions and to - report any defects that you notice.

-
-
-
-
- -
-

This section holds Orcmid's Lair Construction Notes - and related materials introduced in August, 2008.

-

The only content is material identified and linked from the - catalog.

-

This page is part of the engineering, construction management, maintenance, and infrastructure - for Orcmid's Lair.  You are welcome to explore this and other - construction-information pages.   You'll need your hard hat and safety shoes.

-
-
- -
- - - - - - - -
- Construction Zone (Hard Hat Area) - - - - - -

-You are navigating the 
-Orcmid's Lair -construction structure

-
-

created 2008-08-28-18:38 -0700 (pdt) by - orcmid -
-$$Author: Orcmid $
-$$Date: 22-05-06 16:35 $
-$$Revision: 86 $

-
- - - diff --git a/construction/2008/index.htm b/construction/2008/index.htm deleted file mode 100644 index c8e2581..0000000 --- a/construction/2008/index.htm +++ /dev/null @@ -1,161 +0,0 @@ - - - - - - -Orcmid's Lair construction/2008/ Construction Structure - - - - - - - - - - - - - -
- - -Orcmid 1956 SL mirror selfie width= - -

- - construction/2008/
-
-
- - Construction Structure

-
- -

- orcmid>construction>
- 2008>

-

- index.htm>
-  2023-08-28 19:26 -0700 -

-
- - - - - - - - - - - - - - - - - - - - - - -
Superior Structure: - Orcmid's Lair - Construction Material Construction Structure
- Orcmid's Lair Construction - Material Construction Zone
Local Infrastructure:       - index.htm - - Orcmid's Lair - construction/2008 Construction - Structure (this page)
Immediate Content:[none]
Subordinate Structure:          - 08/ - August, 2008
- Status: -
-
- - - - - - -
-
-


- This material conforms to the -
- 2008-08-29 - styles for - - Site - Repaving.  Check those - pages for additional details of the approach and the styles. 
- Contact the - - technical coordinator with questions and to - report any defects that you notice.

-
-
-
-
- -
-

This section holds Orcmid's Lair Construction Notes and related -materials introduced in 2008.

-

For further information, refer to

- -

That catalog provides status and links to all Orcmid's - Lair -construction artifacts, including those carried under this section of the -construction materials.

-
-
-

The only reliable way to access these notes is using the - catalog.

-
-
- -

This construction section is part of the engineering, construction management, maintenance, and infrastructure - for Orcmid's Lair.  You are welcome to explore this and other - construction-information pages.   You'll need your hard hat and safety shoes.

-
-
- -
- - - - - - - -
- - Construction Zone (Hard Hat Area) - -

-You are navigating the 
-Orcmid's Lair -construction structure

-
-

created 2008-08-28-18:38 -0700 (pdt) by - orcmid -
-$$Author: Orcmid $
-$$Date: 22-05-06 16:35 $
-$$Revision: 84 $

-
- - - diff --git a/construction/c000001.htm b/construction/c000001.htm index 219a065..34f33e0 100644 --- a/construction/c000001.htm +++ b/construction/c000001.htm @@ -22,7 +22,7 @@ Orcmid 1956 SL mirror selfie - + @@ -34,13 +34,13 @@

- orcmid>
+
orcmid.github.io>
construction
>

c000001>
2023-08-28 - -19:04 -0700 + S-Format="%Y-%m-%d" startspan -->2023-08-29 + -15:49 -0700

@@ -100,16 +100,6 @@ Construction Catalog (this page) - - - c000002 - Construction - current
- 2003-08-03
- 2003-08-03 - Anchor Site - Dependencies - c000003 @@ -143,24 +133,6 @@     - - - c000010 - Incident Response - 0.00
- 2004-08-29
- 2004-08-28 - Master Announcement Pages - - - - c000011 - Incident Response - 0.00
- 2004-08-29
- 2004-08-28 - Master Feed Announcements -     @@ -191,13 +163,12 @@ - c080801 + c071101
Construction - 0.00
- 2008-08-29
- 2008-08-28 - Site - Repaving + 0.00 + 2023-08-29 + Site + Repair/Preservation   @@ -206,15 +177,6 @@     - - C040801 - Incident Response - 0.00
- 2004-08-30
- 2004-08-30 - von - Clueless Feed Announcements -     @@ -236,15 +198,6 @@     - - C011100 - Site Information - current
- 2003-08-03
- 2001-11-05 - What's - an Orcmid? (orcmid.htm) -     @@ -266,8 +219,7 @@ src="../images/hardhat-thumb.gif" alt="Construction Shack (Hard Hat Area)" align="left" width="80" height="60"> + included from orcmid.github.iio/construction/template/00/c000004c.htm of 2023-08-29T02:25Z -->

 

@@ -277,14 +229,13 @@ You are navigating
Orcmid's Lair construction material.

- + -

created 2003-05-23-17:33 -0700 (pdt) by orcmid +

created 2003-05-23-17:33 -0700 (pdt) by + orcmid
-$$Author: Orcmid $
-$$Date: 22-05-06 12:13 $
-$$Revision: 77 $

+$$Author: Orcmid $