Skip to content
New issue

Have a question about this project? Sign up for a free GitHub account to open an issue and contact its maintainers and the community.

By clicking “Sign up for GitHub”, you agree to our terms of service and privacy statement. We’ll occasionally send you account related emails.

Already on GitHub? Sign in to your account

DAOS-16127 tools: Include relevant pool health in container health #15489

Open
wants to merge 2 commits into
base: master
Choose a base branch
from

Conversation

mjmac
Copy link
Contributor

@mjmac mjmac commented Nov 11, 2024

If the parent pool is in a degraded state, show this in the container
health string, as otherwise users may only focus on the container
health and miss the other details.

Required-githooks: true

Change-Id: Icc2fd74b5c4ca6d6c6ca84b790c99af6ee97f11a
Signed-off-by: Michael MacDonald [email protected]

@mjmac mjmac requested review from a team as code owners November 11, 2024 21:14
Copy link

Ticket title is 'Add daos health check command'
Status is 'Resolved'
Job should run at elevated priority (1)
https://daosio.atlassian.net/browse/DAOS-16127

@github-actions github-actions bot added the priority Ticket has high priority (automatically managed) label Nov 11, 2024
If the parent pool is in a degraded state, show this in the container
health string, as otherwise users may only focus on the container
health and miss the other details.

Required-githooks: true
Change-Id: Icc2fd74b5c4ca6d6c6ca84b790c99af6ee97f11a
Signed-off-by: Michael MacDonald <[email protected]>
@daosbuild1
Copy link
Collaborator

Test stage Unit Test on EL 8.8 completed with status FAILURE. https://build.hpdd.intel.com/job/daos-stack/job/daos/job/PR-15489/2/display/redirect

@daosbuild1
Copy link
Collaborator

Test stage NLT on EL 8.8 completed with status UNSTABLE. https://build.hpdd.intel.com/job/daos-stack/job/daos//view/change-requests/job/PR-15489/2/testReport/

Required-githooks: true

Change-Id: Id405c686fadc206c66d494354b3d26697b2b394b
@daosbuild1
Copy link
Collaborator

Test stage Unit Test on EL 8.8 completed with status FAILURE. https://build.hpdd.intel.com/job/daos-stack/job/daos/job/PR-15489/3/display/redirect

@daosbuild1
Copy link
Collaborator

Test stage Unit Test on EL 8.8 completed with status FAILURE. https://build.hpdd.intel.com/job/daos-stack/job/daos/job/PR-15489/4/display/redirect

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment
Labels
priority Ticket has high priority (automatically managed)
Development

Successfully merging this pull request may close these issues.

4 participants