Skip to content

chore(deps): update dependency ops to v2.16.1 #1241

chore(deps): update dependency ops to v2.16.1

chore(deps): update dependency ops to v2.16.1 #1241

Re-run triggered September 19, 2024 08:02
Status Failure
Total duration 20m 47s
Artifacts 3

integration_test.yaml

on: pull_request
integration-tests  /  Plan
6s
integration-tests / Plan
Matrix: integration-tests / build
Matrix: integration-tests / Integration tests / Integration tests
integration-tests  /  Plan Image Scanning
3s
integration-tests / Plan Image Scanning
integration-tests  /  Required Integration Test Status Checks
0s
integration-tests / Required Integration Test Status Checks
Matrix: integration-tests / scan
Fit to window
Zoom out
Zoom in

Annotations

3 errors and 5 notices
integration-tests / Integration tests / Integration tests (test_auth_proxy.py)
Process completed with exit code 1.
integration-tests / Integration tests / Integration tests (test_plugins.py)
Process completed with exit code 1.
integration-tests / Required Integration Test Status Checks
Process completed with exit code 1.