Jan, 11 2022 status
- AndreyB works on data point logging and live view rusefi#3614 as part of rusEFI usability improvements
- AndreyB is trying to push mck1117/wideband#28 forward as part of Hellen fabrication improvements
- AndreyB is working on GDI4 https://github.com/rusefi/rusefi-hardware/issues?q=is%3Aissue+label%3AGDI as part of BMW 760 epic
- Mark is working on STM32 sleep / CAN wake up as part of Harley Hellen
- Anyone to pick up rusefi#936?
- Anyone to pick up rusefi#3771?
- Anyone to pick up https://github.com/rusefi/rusefi/labels/ADC-shortage?
Sept, 23 2021 status
- two Hellen-Mercedes driving
- Hellen-Nissan started!
- Lua progress
July, 25 2021 status
- we now have five or six Hellen boards too many of these untested
- Matt is helping Hellen-Mercedes and H7 progress
- AndreyB is testing Hellen-Nissan and working on VVT code
- AndreiKA is focusing on Hellen81 and H7
Feb 9, 2021 status
- AndreiKA is focusing on Hellen-One
- AndreyB is focusing on quad VVT
- Matt is working on wideband and VR without ASIC
Jan, 2 2021 status
- We had GDI vehicle start & idle! GDI effort is now suspected since too many projects in the works.
- TCU first real hardware test was not a success
Nov, 18 2020 status
- GDI test mule was damaged during GDI tests
- Matt is working on fueling, wideband and knock detection logic
- TCU first hardware tests are getting closer!
Sep, 7 2020 status
- Stefan is happy enough with idle control and now manufacturing a batch of Miata NA6 & developing a Miata NB2 PnP board
- AndreiKA and AndreyB are merging Hellen code into rusEFI master
- Matt is working on fueling and knock detection logic
- AndreiKA and AndreyB are making rusEFI Online better
- David is making TCU progress
- GDI is slooooowly moving forward
July, 19 2020 status
- Stefan and AndreiKA are looking to improve miata idle (again!)
- AndreiKA and AndreyB are focused on rusEFI Online
- Matt is dealing with a number of different scheduling defects
- Miata NA base tune is getting closer
- GDI is a bit on hold
Apr, 20 2020 status:
- Nick and Chris are focusing on GDI progress
- Matt is focusing on ETB rusefi#1240 rusefi#1336
- x number of Andreys are focusing on data gathering usability rusefi#1337
- andreika is currently focusing on Hellen, SD-card/binary logging, TS plugin and online connectivity
Mar, 02 2020 status:
- playing with some GDI software, but now waiting for repaired MC33816 to come from Seattle
- Matt and DronoGus are working on different parts of getting stepper control using two universal H-bridged, that would give us stepper idle control on microRusEfi.
- A lot of hardware to play with - v12 on Manhattan, v12 on Proteus, setting up microRusEfi fabrication.
Dec, 28 2019 status:
- playing with some GDI while waiting for proteus 0.2 and microRusEfi 0.4.6
- [DONE] top priority is rusefi#1011 Fix and expand commit gate check
Nov, 19 2019 status:
- top priority is rusefi#1011 Fix and expand commit gate check
- [DONE] rusefi#796 Missing dwell altogether in some corner cases still should be addressed
Sep, 19 2019 status:
- rusefi#796 Missing dwell altogether in some corner cases still should be addressed
- Ion Sense https://rusefi.com/forum/viewtopic.php?f=4&t=963 is now somewhere on top of the list!
- [DONE] build server is reliable again
- [DONE] Electronic throttle body is now road-tested including idle control
- CJ125 - probably falling off the wagon since no time :(
June, 07 2019 status:
- new annoying issue: integration testing on new build server is unreliable - disconnects rusefi#816
- rusefi#796 should be addressed
- Electronic throttle body - two and three wire control seems good enough, next step ETB-based idle control see rusefi#783
- Ion Sense https://rusefi.com/forum/viewtopic.php?f=4&t=963
- HIP9011 - still need to improve unit tests and give this functionality another test now that we can reproduce detonation
- CJ125 - still need to improve unit tests and give this functionality another test
May, 31 2019 status:
- rusefi#796 should be addressed
- Electronic throttle body - two and three wire control seems good enough, next step ETB-based idle control see rusefi#783
- Ion Sense https://rusefi.com/forum/viewtopic.php?f=4&t=963
- HIP9011 - still need to improve unit tests and give this functionality another test now that we can reproduce detonation
- CJ125 - still need to improve unit tests and give this functionality another test, also need to merge mck1117's changes into master now that we have a source for cheap used 4.9 sensors
May, 11 2019 status:
- Electronic throttle body - two and three wire control seems good enough, next step ETB-based idle control see rusefi#783
- Ion Sense https://rusefi.com/forum/viewtopic.php?f=4&t=963
- HIP9011 - still need to improve unit tests and give this functionality another test now that we can reproduce detonation
- CJ125 - still need to improve unit tests and give this functionality another test, also need to merge mck1117's changes into master now that we have a source for cheap used 4.9 sensors
Jan, 7 2019 status:
- Electronic throttle body - need to merge mck1117's changes into master https://rusefi.com/forum/viewtopic.php?f=5&t=592
- Ion Sense https://rusefi.com/forum/viewtopic.php?f=4&t=963
- HIP9011 - need to improve unit tests and give this functionality another test now that we can reproduce detonation
- CJ125 - need to improve unit tests and give this functionality another test, alsoneed to merge mck1117's changes into master now we have a source for cheap used 4.9 sensors
Dec, 16 2018 status:
- Electronic throttle body https://rusefi.com/forum/viewtopic.php?f=5&t=592
- Ion Sense https://rusefi.com/forum/viewtopic.php?f=4&t=963